Skip to content

Cable pulling projects and equipment

Discover impressive impressions from our projects in our gallery. From innovative energy solutions to successful implementations – here you can get a visual insight into our work.

Aerial view of temporary cable connections beside a substation

30 temporary construction cables and 10 copper cables via cable bridge, a total of 29,120 meters of cable.

Employees installing temporary cables in a cable route

Cable pulling in the substation of 1,500 meters, 2500mm2 cable.

Cables fixed to a concrete wall with clamps and supports

Cable pulling including attachment to the wall as a supply line to the transformer.

Cable routes and vertical cable runs in a cable cellar

Cable pulling in the cellar of a substation incl.

POWODEN Energie Unimog and cable trailer in alpine terrain

Our maneuverable UNIMOG including cable trailer in the Alps.

Temporary cable connections at a substation

Installation of construction site cables in the substation, via cable bridges.

Steel cable crossing structure with vertical cable runs

Set up and fasten the construction site cable.

Cable drums and transport vehicles at a work site

Transport of construction cable drums with our Tatra 8×8.

Work site and cable infrastructure in open terrain

Preparations for connection work.

Loading-crane truck and cable drums for cable installation

Our Tatra 8×8 lifting the cable drums into the Thaler cable trailer.

Cable installation and vertical cable runs at an energy facility

Erect construction site cables with our crane.

Write to us

Call us or send us a non-binding message. We will get back to you promptly and look forward to a joint project.

Display settings

These preferences apply only to this browser.

Accessibility information