Experienced teams, specialised equipment and documented procedures for cable routes, substations and industrial facilities.
Our management systems are certified to three ISO standards. Employees receive the qualifications and instructions relevant to their tasks.
Structured processes and documented execution.
Environmental aspects considered in planning and delivery.
Systematic prevention and safe working procedures.
Qualifications are assigned according to the work involved. SCC here refers to personnel safety qualifications.
ISO 9001
ISO 14001
ISO 45001
From drum transport to installation, we select vehicles and equipment according to drum weight, cable specifications, route and site conditions.
Mercedes-Benz Arocs 4152 8×6, Tatra Phönix 530 8×8, and Scania and MAN transport equipment.
Bagela, Thaler and Vetter cable trailers, drum stands and heavy transport equipment selected for the cable and route.
Unimog U530, MAN TGE 4×4 and installation vehicles for demanding site conditions.
Volta crawler winch, Zeck and Volta capstan winches, Lancier cable feeders and pushing equipment.
Mobile jointing containers, hydraulic power units, cable rollers and beam equipment.
Pulling-force monitoring, sheath testing and installation tools for documented execution.
Equipment selection and availability are agreed for each project.
Steel fabrication by Powoden power technologies gmbh.
Our partner within the POWODEN group designs and manufactures steel structures and custom components in Söding: frames, cable supports, brackets, cable crossings, cable drums and special constructions.
Site surveys, technical calculations, 3D design, fabrication, delivery and installation are coordinated to meet the project requirements.
EN 1090 up to EXC3
EN ISO 3834-2
EN ISO 17660-1
Certifications in place: ISO 9001, ISO 14001 and ISO 45001.
Frames and custom steel structures.
Cable drums and custom components.
Industrial, high-voltage and extra-high-voltage cables installed using coordinated equipment and procedures.
Cable installation, drum logistics, crossings, testing and removal of temporary connections.
Installation of cable trays, supports, brackets and steel structures.
Controlled removal of cables and plant components with agreed material-handling arrangements.
Sheath testing according to the agreed plan and installation records for handover.
We install and remove temporary cable connections during reconstruction and modernisation works.
Our scope includes drum logistics, cable bridges and risers, agreed route protection and cable sheath testing according to the inspection plan. Responsibilities and interfaces are agreed in advance.
Drum logistics and installation for temporary connections.
Risk assessments and method statements (RAMS) support the coordinated execution of each project.
Survey the route, establish project requirements and coordinate interfaces.
Assess project-specific risks and brief teams on the planned tasks.
Choose transport, pay-off and pulling equipment for the cable, drum and route.
Monitor pulling forces and observe manufacturer-specified bending radii.
Carry out sheath tests and other inspections according to the agreed plan.
Prepare installation and test records for a traceable handover.
Inspection scope, protection measures and responsibilities are agreed for each project.
Cable installation, temporary connections or assembly: we will clarify scope, equipment and procedures with you.