We install industrial cables and high- and extra-high-voltage cables in substations, along cable routes and on demanding construction sites. Trained teams, our own pulling equipment and coordinated procedures ensure controlled execution.
We carry out cable pulling and installation for energy, industrial and infrastructure projects. This includes high- and extra-high-voltage cables, long cable routes, substations and installations in tunnels and galleries.
Pulling and payoff equipment is selected to suit the cable, drum and route. During installation, we monitor pulling forces and observe the manufacturer’s bending radii. Sheath voltage measurements and installation and test records follow the agreed inspection plan.
Temporary construction cables: Drum logistics, installation, cable bridges and dismantling are coordinated with the other work. More about temporary construction cables.
Before work begins, we coordinate the route, logistics, pulling equipment and interfaces on site. Project-specific method statements and risk assessments (RAMS), together with appropriate briefings, support execution.
Discuss the cable type, route length, drum weights and planned schedule with us. We will select the appropriate equipment for your project.
Established companies trust our technical expertise.
Cable laying as well as steel and cable tray assembly are among our core competencies.
A team of technical experts and the right equipment make it possible.
Call us or send us a non-binding message. We will get back to you promptly and look forward to a joint project.